How Long Does a Bathroom Fitting Take

How Long Does a Bathroom Fitting Take Image

Fitting a new bathroom can be an exciting project, but many people want to know how long it will take from start to finish. The time to complete the job depends on a few key things, but most standard bathrooms can be fitted within 7 to 10 days.

Below is a simple guide to help you understand the process and what to expect each day.

What Affects the Time It Takes?

The time it takes to fit a new bathroom depends on several factors. One of the biggest is the size of the bathroom. A small room may only need a few days, while a larger space could take longer. The condition of the existing plumbing and walls is also important. If there are problems like damp patches, old pipework or damaged surfaces, these will need extra time to fix.

Other things that affect the timeline include the type of fixtures chosen, such as the toilet, bath or shower, and whether the layout will stay the same or be changed. Planning ahead and using experienced fitters will help ensure your project runs smoothly.

Day 1: Removal of Old Bathroom

The first day is all about taking out the old bathroom. This includes removing the toilet, sink, bath or shower, and any tiles, flooring or cupboards. It’s a noisy and dusty job, but it's an important part of getting the room ready.

Fitters may also need to check what’s behind the walls and under the floor to make sure the new fittings will be safe and secure. Any problems found now can add to the time, so it’s important to allow room in the schedule just in case.

Bathroom Removal

Day 2–3: Plumbing and Electrical Work

Once the old items are gone, work begins on updating or moving the plumbing and electrics. If the new toilet or sink will be in a different place, pipes may need to be moved. The same goes for light switches, extractor fans or shower units.

This part of the project must follow all safety rules. A qualified plumber or electrician will ensure everything is fitted properly and is safe to use. This step may take longer if extra work is needed due to older systems or hidden issues.

Day 4–5: Wall and Floor Preparation

With the plumbing and electrics in place, it’s time to prepare the room. The walls need to be smooth, strong and ready for tiles or paint. The floor must be flat and clean before any new coverings are added.

This part of the job helps ensure the new bathroom will look good and last a long time. Waterproof boards may be added around the bath or shower to protect against leaks. A strong base is the key to a solid finish.

Day 6–7: Installing the New Fixtures

This is often the most exciting stage, as the new bathroom starts to take shape. The bath, toilet, sink and any storage units are put in place. Skilled fitting helps ensure everything is level, secure and ready for use.

At this point, the project is nearly complete. If you’re adding extras like heated towel rails or underfloor heating, these are also fitted during this stage.

Day 8: Tiling and Finishing Touches

The final stage includes tiling the walls and floor, sealing joints, and adding mirrors, shelves or other details. Grout is applied between the tiles, and everything is cleaned to give a neat, fresh look.

After all work is done, your bathroom will be checked carefully. The plumber will make sure there are no leaks and that water flows as it should. This final check helps ensure the bathroom is safe, clean and ready for daily use.